* Remodeling the second floor bathrooms and kitchen.
* Having open floor plan configuration by removing load bearing walls and adding new posts and beams.
* Converting the ground floor into habitable space by adding a new bedroom, bathroom and an entertainment room with a wet bar, and combining it to the lower unit by adding new interior stairs.
* Doing a full seismic retrofit of the entire building.