The scope of work included the following construction:
* Doing a full foundation replacement by replacing the existing brick foundations with new concrete foundations.
* Remodeling of the entire house (the kitchens, bathrooms, etc).
* Having open floor plan configuration by removing load bearing walls and adding new posts and beams.
* Converting the ground floor into habitable space by adding a new bedroom and bathroom, and combining it to the upper level by adding new interior stairs.